BNSF's rotary works around the curve at MP 51 as they get in position to blow out the 2 cuts south of Stanton. You can see the backhoes working to pull snow down onto the track for the rotary. It ... (more)
BNSF's rotary works slowly thru the man made snow drift near MP 51 on the Zap Line. Crews worked most of the day digging out the 2 drifts along the tracks at MP 51 and piling the snow on the track... (more)
An Antelope Valley Mine at Beluah, ND to Stanton Station, ND coal train has arrive at the generating station at Glen Herald, ND. This train is a shuttle train that runs daily between Beluah and Gl... (more)
A waycar brings up the rear of this 50 car coal train on the Zap Line. This shuttle train works between Beluah, ND and the generating station at Glen Herald, ND. Glen Herald is at MP 47 on the Zap... (more)